Projects
Lighting
The PCC has received permission to continue with the lighting as planned by the DAC. This was completed under a reduced level facility due to the nature and monetary size of the job.
Flexible Liturgical space
The PCC are currently reviewing plans to remove a number of Pews in the south aisle to make a flexible space. This would be used for a children’s area on a Sunday and will also be available for small groups to meet.





